Sign In | Join Free | My infospaceinc.com
China USA WEGI SPORTS INDUSTRY INC logo
USA WEGI SPORTS INDUSTRY INC
USA WEGI SPORTS INDUSTRY INC.
Verified Supplier

4 Years

Home > Polyurethane Running Track >

Engineered to Last: UV-Resistant Full Polyurethane Tracks

USA WEGI SPORTS INDUSTRY INC
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Engineered to Last: UV-Resistant Full Polyurethane Tracks

Price : Price Upon Request

Standard Thickness : 13 mm To 25 mm

Model Number : USWG-FPU-13-1

Wet Skid Resistance : 56 BPN

MOQ : 1000 square meters

Delivery Time : within 15 days after balance

Elongation At Break : 90 Percent

Payment Terms : L/C,T/T

Surface Type : Seamless Non Porous Full PU System

Tensile Strength : 0.8 MPa

Force Reduction : 43 Percent

Recommended Application : Stadium School University And Training Facility

Supply Ability : 10000 Square Meter Per Week

Material : PU Binder And EPDM Rubber Granules

Place of Origin : Guangdong,China

Certification : LABOSPORS/WA/ISO 9001/CE/SGS/

Brand Name : USAWEGI

Performance Level : High Performance Full PU System

Packaging Details : Steel Drums

Contact Now

Engineered to Last: UV-Resistant Full Polyurethane Tracks

A Complete Track System Planned Around the Actual Project

Choosing a running track system involves more than selecting a color or comparing a price per square meter.

The condition of the asphalt or concrete base, local climate, expected daily use, project schedule, technical requirements and installer experience all affect the final result.

USWG supplies a complete Full PU running track system for stadiums, schools, universities, training centers and municipal sports facilities. We can help buyers review the project information, calculate the required materials and prepare a supply plan that matches the actual site.


Engineered to Last: UV-Resistant Full Polyurethane Tracks


Why Project Buyers Choose a Full PU System

A Full PU running track is poured and installed on site as a continuous polyurethane system. It is commonly selected for projects that require a seamless finish, stable surface performance and better resistance to frequent use.

For buyers, the main value is not simply the material itself. It is having the primer, elastic layers, wearing surface and supporting materials planned as one coordinated system.

This helps reduce common purchasing problems such as:

  • Missing components
  • Incorrect material quantities
  • Unclear mixing or application sequences
  • Inconsistent colors between batches
  • Packaging that does not match the construction schedule
  • Technical documents that do not match the supplied model

Confirmed Product Performance

The following values apply to the confirmed Full PU running track model:

  • Force Reduction: 43 Percent
  • Tensile Strength: 0.8 MPa
  • Elongation at Break: 90 Percent
  • Wet Skid Resistance: 56 BPN

These values provide a balanced combination of cushioning, structural strength, flexibility and wet-surface traction.

The final performance of the completed track will also depend on the foundation, installation thickness, site conditions, mixing accuracy, curing and construction quality.

Suitable Project Applications

This Full PU running track system can be considered for:

  • 400-meter athletics tracks
  • Professional and municipal stadiums
  • School sports grounds
  • University athletic facilities
  • Sports clubs and training centers
  • Track and field facilities
  • Existing running track renovation projects

The recommended system and material quantity should be confirmed separately for each project.

What We Need Before Preparing a Quotation

To prepare a useful quotation, please send:

  • Project country and city
  • Total running track area
  • Track drawing or layout
  • Asphalt or concrete base information
  • Required color or color combination
  • Required technical documents
  • Destination port
  • Expected delivery or construction date
  • Whether local installation support is needed

Without this information, a price can only be treated as a general reference.


Engineered to Last: UV-Resistant Full Polyurethane Tracks

What Our Project Support Can Include

Depending on the order scope, USWG can provide:

  • Full PU system recommendation
  • Material quantity calculation
  • Product technical data
  • Available test reports
  • Color confirmation
  • Packing-list preparation
  • Container loading planning
  • Application instructions
  • Remote technical communication
  • Support for the appointed local contractor

Some customers purchase materials for their own installation team. Others require additional assistance with quantity planning, documentation and construction preparation.

The service scope will be confirmed clearly in the quotation.

Project Supply Process

1. Project Review

We review the drawing, total area, base condition, destination and technical requirements.

2. System and Material Planning

The appropriate Full PU system and material components are selected according to the project information.

3. Sample and Document Confirmation

Colors, samples, product data and available reports can be confirmed before bulk production.

4. Production and Packing

Materials are produced, identified and packed according to the approved order and shipment plan.

5. Delivery and Technical Support

Packing information, application guidance and technical communication can be provided to help the local team prepare for installation.



Frequently Asked Questions

Can You Quote the Project Without a Drawing?

A preliminary estimate may be possible, but an accurate material calculation requires the total area, layout and base information.

Do You Only Supply Materials?

No. Material-only supply is available, but we can also provide quantity calculation, technical documents, packing plans and installation guidance according to the project scope.

Can the Same Full PU System Be Used for Every Project?

Not automatically. The product may be the same, but the construction plan must still consider the foundation, climate, expected use, project standard and local installation conditions.

Can These Performance Values Be Used in a Tender?

They may be used for the confirmed product model when supported by the matching test report. Final venue approval may also require field testing and project-specific inspection.

Can the Track Color Be Customized?

Yes. Standard and customized color combinations can be discussed. Final colors should be approved through physical samples or an agreed color reference.

Do You Provide Installation Guidance?

Yes. Application instructions and remote technical communication can be provided to qualified local contractors. Any on-site service must be confirmed separately according to the project location and scope.

Send Us Your Track Drawing

Share the project drawing, total area, base condition, preferred color and destination port.

We will review the information and prepare a project-specific Full PU running track proposal instead of sending a generic material price.


Request a Full PU Running Track Proposal


Product Tags:

UV-resistant polyurethane running track

      

full polyurethane track durable

      

polyurethane track engineered to last

      
Quality Engineered to Last: UV-Resistant Full Polyurethane Tracks for sale

Engineered to Last: UV-Resistant Full Polyurethane Tracks Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: USA WEGI SPORTS INDUSTRY INC
*Subject:
*Message:
Characters Remaining: (0/3000)